Contact Us

Sale Service: 0371-6320 2801
                     0371-6320 2805
After-sales service: 0371-6320 2805
MR. CAI: 181-0371-5723
Mr.Gao: 188-3829-0747
Ms.Huang: 188-3829-0748
Email : nbd@nbdkj.com
Address:8# zhuyuan, Xinhua subdistrict, Xinzheng, Zhengzhou, China

Automatic feed pyrolysis furnace

Release time: 2024-07-10 03:41:12 Number of views: 126

5004 (1)

Equipment introduction:

This equipment through the pressure detection of the furnace tube, to provide safety protection functions such as cutting off gas, cooling, can also be discharged flammable tail gas ignition treatment, and equipped with dual ignition protection, to ensure that the exhaust gas can be fully burned. With the use of tubular furnace can also be the furnace tube gas automatic cleaning replaceme

Edit Content

Equipment introduction:

This equipment through the pressure detection of the furnace tube, to provide safety protection functions such as cutting off gas, cooling, can also be discharged flammable tail gas ignition treatment, and equipped with dual ignition protection, to ensure that the exhaust gas can be fully burned. With the use of tubular furnace can also be the furnace tube gas automatic cleaning replaceme

Edit Content

Configuration

1. Automatic circulation vacuum cleaning and air supply;

2. The exhaust end of two automatic igniters, one working one protection, to ensure the full combustion of combustible gas and stable operation of equipment;

3. Pipeline self-extinguishing anti-tempering device, strict control of flammable gas backsuction;

4. A variety of working modes can be selected and customized;

5.NBD-101E embedded operating system English and Chinese interchange graphical interface, 7 inch real color touch screen input, intelligent man-machine dialogue mode, non-linear pattern temperature correction.

Model

NBD-2AQD

Control system

 

Corrosion-resistant stainless steel pipe or Teflon (optional).

Size of interface

1/4”Double sleeve joint

pipeline pressure

-0.1-0.15MPa

Net weight

20KG

Cautions

1. Ensure that the absolute pressure in the pipeline is less than 0.15MPa;

2. After the gas cylinder is connected, soapy water should be used for leak detection test.

Service

1 year warranty with lifetime support (consumable parts not included).

 Disclaimer:

 The product introduction content of this site (including product pictures, product descriptions, technical parameters, etc.) is for reference only. There may be some difference between the stated content and the actual situation due to the delay in updating. Please contact our customer service staff for confirmation. The information provided by this Site does not constitute any offer or acceptance. NOBODY will improve and modify any information on this site from time to time without prior notice.

Edit Content
Click on the Edit Content button to edit/add the content.
Edit Content
Click on the Edit Content button to edit/add the content.

推荐产品

Vertical tube furnace 1700℃

Mini Fluidised Bed Vertical Tube Furnace

Multi heating zone CVD system

High temperature tube furnace 1500℃